Project Overview

The Background

A critical infrastructure project designed to alleviate water shortages in the western districts of Phnom Penh.

Objectives

Increase production capacity by 50,000 m3/day and ensure compliance with WHO water quality standards.

Design Concept

Industrial efficiency meeting sustainable hydraulic engineering.

Scope of Services

Civil Works
Pipe Laying
Pumping Station Construction
Reservoir Building

Key Challenges & Solutions

  • 1

    Soft soil conditions requiring extensive piling.

  • 2

    Coordination with existing underground utilities.

Project Data

Client
Phnom Penh Water Supply Authority
Location
Phnom Penh
Built Area
12 Hectares
Year & Status
2024 Under Construction