Theme preference is saved locally

Electricite du Cambodge (EDC)
Fig. EDCGovernment Office Building

ELECTRICITE DU CAMBODGE (EDC)

Location Coordinates

Phnom Penh

Back to Index

Technical Data

Client
Government of Cambodia
Status
Completed
Year
2023
Area
45,000 sqm
Scope
Design & Build
Inquiries

Interested in a similar project?

Contact Engineering

Modern office tower for the national electricity utility provider.

This project represents a benchmark in modern Cambodian engineering. Designed to meet the highest standards of safety, sustainability, and functionality, the Electricite du Cambodge (EDC) stands as a testament to precision execution. The structural integrity leverages advanced concrete composites, while the façade integrates passive cooling technologies suitable for the tropical climate.

From the initial geotechnical surveys to the final M.E.P. commissioning, Kimmex managed every phase with strict adherence to ISO 9001:2015 quality protocols.

Detail
Fig. 1.1
Detail
Fig. 1.2
Detail
Fig. 1.3
Detail
Fig. 1.4
Next Project

National Social Security Fund (NSSF)